ArcticAir Commercial HVAC
Request a Quote
Avg. response in 4 hours
Avg. response in 4 hours
SLA Summary
60-minute on-site response for all contracted clients. Written PM reports with photos. 4-hour emergency parts sourcing. Multi-site clients get a dedicated account manager.
System Types Serviced
Brands Serviced
Complete replacement of two aging centrifugal chillers (500 tons each) in a downtown Phoenix high-rise. Project included new primary-secondary chilled water piping, variable frequency drives on all pumps, and full integration with the building BAS. Work was phased across six weekends to avoid tenant disruption. Post-commissioning energy audit confirmed a 28% reduction in cooling plant kWh compared to the prior system.
Sq Footage
320,000 sf
Tonnage
1000T
Value Range
$280,000 – $340,000
Energy Savings
28%
Two-season replacement program covering 48 aging rooftop units across a regional retail client's 12 Phoenix metro strip mall locations. Each location averaged 4 RTUs ranging from 7.5 to 25 tons. ArcticAir managed procurement, permitting, and installation across all 12 sites with a dedicated project coordinator. Year 1 covered 24 units; Year 2 covered the remaining 24. All units replaced with Carrier high-efficiency RTUs programmed to a centralized BAS dashboard.
Tonnage
360T
Value Range
$420,000 – $490,000
| Monday | Closed |
| Tuesday | Closed |
| Wednesday | Closed |
| Thursday | Closed |
| Friday | Closed |
| SaturdayToday | Closed |
| Sunday | Closed |
4820 E McDowell Rd Phoenix, Arizona 85008